Australia’s already besieged construction industry may be heading into a second wave of insolvencies.
The first wave was driven by the dramatic increase in construction costs that followed the pandemic, with builders caught between fixed-price contracts and rapidly escalating labour and material bills.
This time the warning signs are buried in the contracts already sitting in builders’ books.
Build Metric says the second wave revolves around builders who are still signing fixed-price contracts based on estimates that fail to account for what materials, labour and fuel will cost when the job is actually delivered.
The problem, the construction estimating and quantity surveying firm points out, is that…

